 Balwez Refrences List  | 
||||||
| 
 No  | 
 Name of project  | 
 Client  | 
 Duration  | 
 Location  | 
 Cost USD  | 
 Year  | 
| 
 1  | 
 Construction of Qarachug road 27.4 km  | 
 EBL Governorate  | 
 12months  | 
 Makhmur  | 
 7,250,000  | 
 2021-2022  | 
| 
 2  | 
 Land scaping earth work Pavilion compound  | 
 LALAV group  | 
 12months  | 
 Erbil  | 
 3,000,000  | 
 2021-2022  | 
| 
 3  | 
 Construction of EBL-DHK Highway road 16km  | 
 Hemin group  | 
 12months  | 
 Erbil  | 
 12,000,000  | 
 2020-2021  | 
| 
 4  | 
 Construction of EBL 120m Highway road  | 
 Hemin group  | 
 24months  | 
 Erbil  | 
 8,000,000  | 
 2019-2020  | 
| 
 5  | 
 Supply of PPE (Mask, gloves, hand gel) kit  | 
 Acted  | 
 12months  | 
 Mosul  | 
 12,242  | 
 Jul-21  | 
| 
 6  | 
 Supply and installation of Oxygen plant 15m3/hr baiji general hospiatl  | 
 IOM  | 
 120 days  | 
 Tikrit  | 
 62,926  | 
 Jul-21  | 
| 
 7  | 
 Renovation of Baharka Park  | 
 UNHCR  | 
 90days  | 
 Erbil  | 
 56,448  | 
 Feb.2021  | 
| 
 8  | 
 Construction of Aram Village compound consist of 700 houses  | 
 Investment  | 
 2 years  | 
 Erbil  | 
 2021  | 
|
| 
 9  | 
 Remodeling of Children Physio department in Dohuk  | 
 GIZ-AISPO  | 
 60days  | 
 Dohuk  | 
 39,000  | 
 Dec.2020  | 
| 
 10  | 
 Remodeling of Zanin Health Center in Dohuk  | 
 GIZ-AISPO  | 
 90days  | 
 Dohuk  | 
 231,000  | 
 Dec.2020  | 
| 
 11  | 
 Disludging of Cesspool of Salamiyah camp  | 
 ACTED  | 
 6 months  | 
 Salamiyah  | 
 Jan-20  | 
|
| 
 12  | 
 Supply of tools and Chemical materials  | 
 ACTED  | 
 3 days  | 
 Dohuk  | 
 3,316  | 
 Dec.2019  | 
| 
 13  | 
 Supply of Kit Tools  | 
 PAH  | 
 one day  | 
 Erbil  | 
 1,718  | 
 Dec.2019  | 
| 
 14  | 
 Rehabilitaion of two schools in Sinjar Nineve  | 
 WVI  | 
 40 days  | 
 Nineve  | 
 20,000  | 
 Dec.2019  | 
| 
 15  | 
 Rehabilitation for Al Shaab Park Ninawa - Mosul  | 
 ACF  | 
 10 days  | 
 Mosul  | 
 49,880  | 
 Dec.2019  | 
| 
 16  | 
 Construction of water network, Hydrant and Fire Fighting system of Dohuk Termanl  | 
 Dareen Group  | 
 3months  | 
 Dohuk  | 
 920,000  | 
 Oct.2019  | 
| 
 17  | 
 Renovation of Shelters in Tallafr Mosul  | 
 ACTED  | 
 60days  | 
 Mosul  | 
 25,000  | 
 Sep-19  | 
| 
 18  | 
 Several works of cesspool construction and cabin works  | 
 ACTED  | 
 7 days  | 
 Salamiyah  | 
 4,000  | 
 2018  | 
| 
 19  | 
 Supply HDPE pipes and fittings  | 
 ACTED  | 
 2 days  | 
 Mosul  | 
 5,000  | 
 2018  | 
| 
 20  | 
 Variant and extend supply of (UPS + Acrylic cabinet + constructoin works) of Zakho  | 
 AISPO  | 
 30 days  | 
 Dohuk -  | 
 50,000  | 
 2018  | 
| 
 21  | 
 Health Laboratory  | 
 Zakho  | 
||||
| 
 22  | 
 Supply of NFI + wash materials (HDPE pipes and fittings)  | 
 ACTED  | 
 2 dyas  | 
 Mosul -  | 
 5,400  | 
 2018  | 
| 
 23  | 
 Construction of Zakho Health Laboratory  | 
 AISPO  | 
 6 months  | 
 Dohuk  | 
 310,000  | 
 2018  | 
| 
 24  | 
 Supply of Construction materials  | 
 ACTED  | 
 7days  | 
 Mosul  | 
 85,000  | 
 2017  | 
| 
 25  | 
 Supply of Furniture, Caravan and NFI goods to Salamiyah camp  | 
 ACTED  | 
 7 days  | 
 Mosul  | 
 15,000  | 
 2017  | 
| 
 26  | 
 Implementation of Kurd Max Satellite canal Building  | 
 KURD MAX  | 
 12 months  | 
 Erbil  | 
 745,000  | 
 2017  | 
| 
 27  | 
 Renovation and Extension of Nawroz private hospital  | 
 Nawroz Hospital  | 
 10 months  | 
 Erbil  | 
 781,064  | 
 2017  | 
| 
 28  | 
 Supply of Winter Kits  | 
 IRC  | 
 one year  | 
 Baghdad,  | 
 Frame Work  | 
 2016-2017-2018  | 
| 
 29  | 
 Supply of Hygiene and Underwear kits  | 
 IRC  | 
 0ne year  | 
 Tik it S lBaghdad,  | 
 Frame Work  | 
 2016 -2017-2018  | 
| 
 30  | 
 Transportation and distribution of fuel for schools in Erbil  | 
 M.O.Education  | 
 20 days  | 
 Erbil  | 
 112,000  | 
 2016  | 
| 
 31  | 
 kid zone park include pump station construction  | 
 Rwanga  | 
 6months  | 
 Dohuk  | 
 478,000  | 
 2015-2016  | 
| 
 32  | 
 Rehabilitation Supply  | 
 ACTED  | 
 1day  | 
 Erbil  | 
 13,000  | 
 Nov.2016  | 
| 
 33  | 
 Supply of Cleaning kits  | 
 ACTED  | 
 1day  | 
 Erbil  | 
 2,000  | 
 Nov.2016  | 
| 
 34  | 
 Supply of Cleaning kits  | 
 ACTED  | 
 1day  | 
 Erbil  | 
 6,000  | 
 Oct.2016  | 
| 
 35  | 
 Supply for Biscuits  | 
 ACTED  | 
 2days  | 
 ERB, DHK  | 
 10,000  | 
 Aug.2016  | 
| 
 36  | 
 Supply of School Kits  | 
 ACTED  | 
 4days  | 
 ERB, DHK  | 
 14,500  | 
 Aug.2016  | 
| 
 37  | 
 Supply of Cleaning Kits  | 
 ACTED  | 
 2days  | 
 ERB  | 
 2,000  | 
 Aug.2016  | 
| 
 38  | 
 Supply of Military uniforms consist of 10 items (uniform, jacket, beret, belt, logos, t shirt,  | 
 Interior Ministry  | 
 60days  | 
 Erbil  | 
 1,152,000  | 
 2016  | 
| 
 39  | 
 Construction and Establishment of a Farm of 75000m2 include construction of ( 6  | 
 Private Investment  | 
 12months  | 
 Erbil  | 
 2,000,000  | 
 2015  | 
| 
 40  | 
 Supply and installation of 48 Green house with dimension (51m*10m*3.25m) the work  | 
 Private Investment  | 
 30days  | 
 Garmian  | 
 424,000  | 
 2015  | 
| 
 41  | 
 Construction of Qadiya IDP 2000 caravans Camp the work include (, kindergarten, youth center by prefab fabrication) include Bore hole drilling 2 no, main pipe line and pump  | 
 Rwanga  | 
 60days  | 
 Dohuk-  | 
 14,000,000  | 
 2015  | 
| 
 42  | 
 Construction of Khanaqeen IDP 512 tents Camp (300m*600m) include pump station with main pipe line.  | 
 ACTED  | 
 56days  | 
 Khanaqeen  | 
 1,200,000  | 
 2014-2015  | 
| 
 43  | 
 Land scaping, grading and Supply laying of Gravel of 5-7 cm thick with leveling  | 
 ACTED, NRC  | 
 2days  | 
 Erbil -  | 
 6000$  | 
 2014  | 
| 
 44  | 
||||||
| 
 45  | 
 Construction of CFS/ YFS and CPU (Kindergarten)  | 
 ACTED  | 
 30days  | 
 Dohuk -  | 
 83,000  | 
 2014  | 
| 
 46  | 
||||||
| 
 47  | 
 Supply of Fire extinguisher different types, fire blanket safety tools  | 
 Al shimal oil Co.  | 
 30days  | 
 Sulaimany  | 
 452,000  | 
 2014  | 
| 
 48  | 
 Construction of 6m Cesspool, slab construction, latrines connection and latrines fencing.Garmawa camp  | 
 ACF  | 
 20days  | 
 Erbil  | 
 40,000  | 
 2014  | 
| 
 49  | 
 Supply of (prefab cabins, benches, shadow nets and construction of walk ways...etc.)  | 
 ACTED  | 
 2months  | 
 Erbil  | 
 20,000  | 
 2014  | 
| 
 50  | 
 Supply of Family mall by cleaning Hygiene materials Diversy brand  | 
 Family mall  | 
 12months  | 
 Erbil  | 
 On going  | 
 2015-2017  | 
| 
 51  | 
 Supply of Family mall by cleaning machines and equipment’s TASKI brand  | 
 Family mall  | 
 12months  | 
 Erbil  | 
 On going  | 
 2015-2017  | 
| 
 52  | 
 Construction of 4 hangers the work include construction of cesspools and septic tanks  | 
 M.O. Peshmarga  | 
 6 months  | 
 Erbil -  | 
 1,250,000  | 
 2013 -2014  | 
| 
 53  | 
 Construction of water network of Syrian refugee Gawilan camp include Bore hole work with pump station  | 
 ACF  | 
 45 days  | 
 Dohuk - Gawilan  | 
 350,000  | 
 2014  | 
| 
 54  | 
 Construction of (Septic tanks, cesspool, sanitary connection, Sanitary concrete slabs,etc) for Syrian refugee Gawilan camp  | 
 ACF  | 
 2 months  | 
 Dohuk - Gawilan  | 
 40,000  | 
 2014  | 
| 
 55  | 
 Construction of Qushtapa youth center project  | 
 Rwanga  | 
 3 months  | 
 Erbil  | 
 250,000  | 
 2014  | 
| 
 56  | 
 kindergarten camp of Dara Shakran project  | 
 Rwanga  | 
 3months  | 
 Erbil  | 
 225,035  | 
 2014  | 
| 
 57  | 
 Construction of work shop area of Prefab Design and construction 4000m2  | 
 M.O. Peshmarga  | 
 2months  | 
 Erbil -  | 
 650,000  | 
 2013  | 
| 
 58  | 
 Supply of 200 Prefab cabins 3*6  | 
 M.O. Peshmarga  | 
 2 months  | 
 Erbil -  | 
 900,000  | 
 2013  | 
| 
 59  | 
 Supply of 200 tents (4m*6m)  | 
 M.O. Peshmarga  | 
 1 months  | 
 Erbil -  | 
 120,000  | 
 2014  | 
| 
 60  | 
 Construction of 2 sleeping halls building the work include construction of cesspools and  | 
 M.O. Peshmarga  | 
 8 months  | 
 Erbil -  | 
 750,000  | 
 2013  | 
| 
 61  | 
 septic tanks and pump station.  | 
 Baharka  | 
||||
| 
 62  | 
 Construction of 2 restaurant the work include construction of cesspools and septic tanks and pump station  | 
 M.O. Peshmarga  | 
 6 months  | 
 Erbil - Baharka  | 
 250,000  | 
 2013  | 
| 
 63  | 
 Construction of Ganjan city water and sanitary network the work include construction of cesspools and septic tanks  | 
 Municipality Erbil  | 
 6 months  | 
 Erbil -  | 
 350,000  | 
 2012  | 
| 
 64  | 
 Supply and installation of 34m3 galvanized water tank to Kirkuk children hospital with net connection and pump station  | 
 Ministry of Health  | 
 2 months  | 
 Kirkuk  | 
 123,000  | 
 2011  | 
| 
 65  | 
 Procurements, Camp construction, Accommodation, Machine supply, HR, Survey and Profile checking, Construction fabrication installation for project of High Way Dokan Chiwar Qurna second part  | 
 USAS  | 
 2 months  | 
 Sulaimany  | 
 1,250,000  | 
 20011-2013  | 
| 
 66  | 
 Procurements, Camp construction, Accommodation, Machine supply, HR, Survey and Profile checking, Construction fabrication installation for project of High Way Erbil Koya second part Investment agency Naqar CHAR BRA, CHAR DERIA & 4b group  | 
 USAS  | 
 2 months  | 
 Erbil  | 
 1,750,000  | 
 20011-2013  | 
| 
 67  | 
 Landfill cutting and filling for Kurdistan city Erbil  | 
 NAQAR  | 
 4 months  | 
 Erbil  | 
 600,000  | 
 2012  | 
| 
 68  | 
 Implementation of Soran Private Hospital  | 
 Zozik  | 
 12months  | 
 Erbil  | 
 2,500,000  | 
 2010  | 
| 
 69  | 
 Implementation of Soran MRI complex  | 
 Zozik  | 
 12months  | 
 Erbil  | 
 2,786,000  | 
 2010  | 
| 
 70  | 
 Koya hay bat sultan man street  | 
 M.O. Rehabilitation  | 
 3 Years  | 
 Koya  | 
 5,382,042  | 
 2010-2013  | 
| 
 71  | 
 Digging of five water wells in Garmian with construction of well rooms  | 
 M.O. Municipality  | 
 3 Months  | 
 Garmian  | 
 540,356  | 
 2010  | 
| 
 72  | 
 Digging of five water wells in Aghgeler  | 
 KNOC oil company  | 
 2 months  | 
 Sulaimany  | 
 589,683  | 
 2009  | 
| 
 73  | 
 Yeki badawan main Streets  | 
 M.O. Municipality  | 
 2 years  | 
 Erbil  | 
 5,416,600  | 
 2010-2012  | 
| 
 74  | 
 Hay askari, shahidan project  | 
 M.O. Municipality  | 
 1year  | 
 Erbil  | 
 1,250,000  | 
 2009  | 
| 
 75  | 
 Azadi street project  | 
 M.O. Municipality  | 
 1 Year  | 
 Erbil  | 
 833,300  | 
 2009  | 
| 
 76  | 
 Construction of Kirkuk Cement Factory Weighing 5 bases  | 
 KUK Cement Fac.  | 
 3 months  | 
 Kirkuk  | 
 545,000  | 
 2009  | 
| 
 77  | 
 Construction of Oil fields accommodation and project camp area Sulaimany - Takya include pump station, boreholes and main pipe line.  | 
 KNOC - ZOZIK  | 
 3 months  | 
 Sulaimany  | 
 2,800,000  | 
 2009  | 
| 
 78  | 
 implementation of the project of establishing the course of Funds (3 × 3) along the embankment of the station (2000) to the station (3100) in the city of Ainkawa  | 
 M.O. Municipality  | 
 3 months  | 
 Erbil-Ainkawa  | 
 224,500  | 
 2008  | 
| 
 79  | 
 Supply of school appliances (tables, desks, furniture’s, electric appliances...etc.) for three  | 
 ACDI VOCA  | 
 2months  | 
 Erbil  | 
 430,000  | 
 2008  | 
| 
 80  | 
 schools ACDI VOCA CHAR BRA, CHAR DERIA & 4b group  | 
 2months  | 
||||
| 
 81  | 
 Supply and construction of Zilkan pump station and GI pipe line  | 
 DAI/OTI/USAID  | 
 1 months  | 
 Nainawa-  | 
 95,000  | 
 2007  | 
| 
 82  | 
 Construction & Paving of Hay AL kadisia Road by Asphalt in Talafer  | 
 IRD  | 
 2 months  | 
 Nainawa-  | 
 143,000  | 
 2007  | 
| 
 83  | 
 Construction of Tal Qasab network GRP pipe line (4",2",1", 3/4")  | 
 IRD  | 
 2 months  | 
 Nainawa-  | 
 246,000  | 
 2007  | 
| 
 84  | 
 Rebuild works for renovation of Mosul governorate agencies (schools, clinic centers, sport centers, play yard, etc.)  | 
 IRD/ USAID  | 
 12months  | 
 Mosul  | 
 3,440,000  | 
 2007 - 2008  | 
| 
 85  | 
 implementation of the project of establishing a school containing (12) Division in the neighborhood of Sven in the city of Irbil  | 
 M. O. Education  | 
 1 Year  | 
 Erbil  | 
 1250000  | 
 2007  | 
| 
 86  | 
 Implementation of Synthetic limbs Emergency hospital  | 
 UNOPS - Zozik Co.  | 
 1year  | 
 DOHUK  | 
 384,000  | 
 2005  | 
| 
 87  | 
 implementation of the project of establishing a school containing (12) Division in the  | 
 M. O. Education  | 
 1 Year  | 
 Erbil  | 
 1,234,000  | 
 2007  | 
| 
 88  | 
 neighborhood of Sven in the city of Irbil  | 
|||||
| 
 89  | 
 Deliver electricity to the project Shrdhaohy Diana / Soran with the purchase of generating electricity  | 
 M.O. Elec.  | 
 6 months  | 
 Erbil-Soran  | 
 654000  | 
 2007  | 
| 
 90  | 
 Construction of sports stadium Banslawa  | 
 M.O. Municipality  | 
 3 months  | 
 Erbil-  | 
 202500  | 
 2006  | 
| 
 91  | 
 Establishment of a sports stadium Soran  | 
 M.O. Municipality  | 
 24 months  | 
 Soran  | 
 1983400  | 
 2006  | 
| 
 92  | 
 Stage two of UNDP program of Dohuk Governorate for installation of 132/33/11 kV  | 
 UNDP -  | 
 18months  | 
 Dohuk  | 
 1,850,000  | 
 2005-2006  | 
| 
 93  | 
 Sumail Subs. & 33/11 kV Dohuk1 and Sheladize Subs  | 
 GALALAH Co.  | 
||||
| 
 94  | 
 Construction of Al-Khazer subs.33/11 KV substation In Mosul Governorate. ZOZIK Co.  | 
 Washington Group.  | 
 12months  | 
 Mosul  | 
 1,450,000  | 
 2005-2006  | 
| 
 95  | 
 Construction and erecting of 33kv transmission line (DHK - Atrush / Zakho - Darkar)  | 
 Washington Group. MITASH Turkey  | 
 12months  | 
 Dohuk  | 
 6,634,000  | 
 2005-2006  | 
| 
 96  | 
 Construction and erecting of 33kv transmission line Al Khazer - Hamdania  | 
 Washington Group. Ozdil Turkey Co  | 
 6months  | 
 Mosul  | 
 2,600,000  | 
 2005-2006  | 
| 
 97  | 
 implementation of the project of establishing a school containing (12) in the Division of  | 
 M. O. Education  | 
 12 months  | 
 Erbil-Soran  | 
 1220000  | 
 2004  | 
| 
 98  | 
 implementation of a project to build a health center with a doctor's house in the area of Daman on  | 
 M. O. Health  | 
 6 months  | 
 Erbil  | 
 432100  | 
 2004  | 
| 
 99  | 
 implementation of the project of establishing a school contains (6) Division in the village of Bntrd to Daman  | 
 M. O. Education  | 
 9 months  | 
 Erbil  | 
 342000  | 
 2004  | 
| 
 100  | 
 implementation of the project of establishing a school contains (6) Division in the village of Mirth to spend Daman  | 
 M. O. Education  | 
 9 months  | 
 Erbil  | 
 323,700  | 
 2004  | 
| 
 101  | 
 33/11 kv ( Kani Masi, Aqre, Bard rash, Batel, Ammadia & Sarsang one distribution substation 132 kv West Dohuk )  | 
 UNDP - ENERGOINVEST  | 
 12months  | 
 Dohuk  | 
 2002 -2003  | 
|
| 
 102  | 
 Stage one of (ENRP) UNDP Program of Dohuk Governorate: Profile, Survey, and Construction Foundation & Erecting for 280 towers 33 kV in these Lines (SarSang - Ammadia / Ammadia - Sheladize / Sumail - Battel/ Ammadia - Kani Masi).  | 
 UNDP - KEC Int. Indian  | 
 18months  | 
 Dohuk  | 
 2002 -2004  | 
|
| 
 103  | 
 Stage one of (ENRP) UNDP Program of Dohuk Governorate: Rehabilitation for transmission line of 132 KV for 30km  | 
 UNDP - KEC Int. Indian  | 
 6months  | 
 Dohuk  | 
 2003-2004  | 
|
| 
 104  | 
 Master plan of water network Dohuk city: with SEURECA France Co. under UNOPS supervision.  | 
 UNOPS - SETEC Eng. Austrian Co.  | 
 12months  | 
 Dohuk  | 
 2003-2004  | 
|
| 
 105  | 
 Master plan of Dohuk city sewerage system SEURECA France  | 
 UNOPS -  | 
 12months  | 
 Dohuk  | 
 2003-2004  | 
|
| 
 106  | 
 Projects of rebuilt Iraq in North of Iraq (Salahaddin, Kirkuk, Nainawa & Dohuk Governorate) to complete more than 200 projects of renovation buildings, training courses  | 
 USAID - ZOZIK Co.  | 
 24months  | 
 Dohuk  | 
 2003-2005  | 
|
| 
 107  | 
 Construction of Emergency hospital in Dohuk  | 
 UNOPS - ZOZIK Co.  | 
 18months  | 
 Dohuk  | 
 364,000  | 
 2002-2005  |